A Vuong Hydroelectricity
A Vuong Hydroelectricity
A Vuong Hydroelectricity
A Vuong Hydroelectricity
A Vuong Hydroelectricity

Introdution

Price: Updating

Phone:

Time to visit a place: 120 phút

Open Time: 8:00 AM - Close Time: 6:00 PM

Email: tinhvannguyen007@gmail.com

Address: Thôn Cutchrun, Xã Mà Cooi, Huyện Đông Giang, Tỉnh Quảng Nam

As a highland district with a dense system of rivers, Dong Giang district not only has a landscape of mountains, rivers, streams, rapids, but also a system of hydropower plants. These include Song Kon and A Vuong hydropower plants. Hydroelectric projects have a great significance for the socio-economic development of the country in general and of Quang Nam province in particular. A Vuong hydropower plant started construction in August 2003. This project was created by a lot of sweat, tears, enthusiasm and expectations of officials, engineers and construction workers. The project has a ladder design including a system of weirs, spillways, energy lines and a hydroelectric power plant with two units with a total capacity of 210MW, the average electricity output of 815 million Kwh per year. The main items of the project are located in dangerous locations, with high terrain 

Service

Review and Evaluation

/ 5
evaluate

You need to or Register new account for leaving comments.

Map

Introdution

×

As a highland district with a dense system of rivers, Dong Giang district not only has a landscape of mountains, rivers, streams, rapids, but also a system of hydropower plants. These include Song Kon and A Vuong hydropower plants. Hydroelectric projects have a great significance for the socio-economic development of the country in general and of Quang Nam province in particular. A Vuong hydropower plant started construction in August 2003. This project was created by a lot of sweat, tears, enthusiasm and expectations of officials, engineers and construction workers. The project has a ladder design including a system of weirs, spillways, energy lines and a hydroelectric power plant with two units with a total capacity of 210MW, the average electricity output of 815 million Kwh per year. The main items of the project are located in dangerous locations, with high terrain 

Sample Plan

Accommodations

Food